St. Augustine College — 80-Seat NextGen Digital Campus Lab
Complete design, structured cabling, and turnkey commissioning of an 80-seat digital learning complex serving 1,800+ students.
Existing Bottlenecks & Operational Constraints
The school suffered frequent power fluctuations, erratic cabling, and an outdated 20-seat computer room insufficient for national WASSCE e-testing mandates.
Cloud Tech Ghana Architecture & Installation
Cloud Tech Ghana installed a 25kVA online power conditioning system, multi-level anti-static flooring, 80 Core i5 workstations, dual gigabit fiber uplinks, and centralized teacher monitoring consoles.
Post-Commissioning Operational Impact
Zero equipment downtime during the entire 2025 WASSCE testing period, full capacity for ICT electives, and a 99.98% network uptime rating.
Need a Similar Deployment?
Our engineers can inspect your site and provide an itemized Bill of Quantities.
Request Matching Quote